Back in 2011, we installed a photovoltaic system with over 780 kilowatts peak on our production and storage halls. This year, the last free and newly created roof areas were also equipped with solar modules. Through the expansion, we now generate ~1.1 megawatts peak of green energy.
24.05.2022